Architect or builder first in Guyana: who you hire first decides whether it gets built

House drawings and a cost estimate on a site table beside a new block foundation in Guyana

Introduction

Last verified: September 2026

There’s a number that gets passed around builders: 80 percent of house designs never get built. I’ve never seen anyone show where it comes from, so I won’t ask you to believe it.

What I can tell you is what I’ve seen. In twenty years of building in Toronto and Guyana, I’ve watched more finished drawings go into a drawer than I could list. Good drawings. Some of them beautiful. All of them paid for.

Almost every time, for the same reason. They came in over budget.

The short answer

Hire the builder first. Then have the builder and the designer work together from the first sketch, because the builder is the one who knows what every line on that drawing costs. At BackHome that’s one team. Our designers work in-house, and the design fee sits inside your build budget.

Why good drawings die

A designer draws what you describe. That’s the job. You say four bedrooms, a big kitchen, an upstairs balcony facing the road, and that’s what comes back.

What doesn’t come back is the price, because the designer isn’t the one buying the blocks, the steel, the windows and the kitchen. That’s no knock on architects. They’re paid to design what you describe. Pricing it is my job.

So here’s how it goes. You describe the house. The designer draws 2,400 square feet over two storeys, because that’s what your description adds up to. At standard spec that’s 67 to 77 million to build, before a single dollar of site works. If your number is 60, that drawing was dead the day it was finished. You paid for it anyway.

Make it three storeys and it gets worse. Now the house needs a soil test at 1.3 million a hole, and possibly piling that nobody put on paper. I wrote about where that line sits in soil test cost in Guyana.

What happens next

I’ve had this conversation more times than I can count, and it runs the same way.

Someone arrives with a finished set of drawings and a budget. We price the drawings properly. They come in over. Now there are three choices, and none of them are good. Find more money. Build less house, which means redrawing anyway. Or pay to redesign, which means paying for the design a second time.

This is where people go wrong. They treat the drawings as the finish line and the price as a formality. The price is the finish line. A drawing you can’t afford to build is a picture of a house.

What the builder brings to the first sketch

When the builder is in the room from the start, the questions change. Before a line is drawn, you know what a square foot costs at the finish level you want: 28,000 to 32,000 at standard spec, 33,000 to 42,000 mid-range, 45,000 and up for high-end. You know that a raw lot takes 8.5 to 16 million in site works before the house begins. You know whether your size and height put you in soil test territory.

Then, while the designer is drawing, somebody is asking what that roofline adds, whether that span needs steel, and whether the second balcony is worth what it costs. Those questions are cheap on paper. On site they’re the most expensive questions in the build.

How we do it

I’ll be straight about my bias. BackHome is a design-and-build firm, so weigh what I say with that in mind. But the order matters whoever you hire.

We agree the budget first, then design inside it. The design fee is part of the build budget, so you’re never paying for a drawing that has no price attached. My own fee is fixed as a dollar figure when we sign. People don’t come to us for a quote on someone else’s drawings. They come to have one team design the house and build it.

If you already have drawings

Don’t throw them away. Get them priced line by line by someone who builds, before you do anything else. If they come in over, you’ll know by how much, and whether to trim or redraw.

One more thing before you pay any designer. Ask in writing who owns the drawings when the work is done. If the answer is the designer, find out what that means before you take the plans to anyone else.

Doing this from overseas

From Toronto or New York, hiring the architect and the builder separately means managing two firms who’ve never worked together. Every gap between them comes back to you, usually by WhatsApp, usually late at night. One team means one call, and one person answerable for whether the drawing and the price still match.

The rule behind it

I build by what I call the Completion Doctrine. A house doesn’t start until it’s designed and costed down to the last fixture, and the money to finish it exists in writing. Starting is easy. Finishing is rare.

This article is two parts of that rule. The budget sets the design, never the other way round. And the builder is in the room before anyone draws, because the person who has to buy what’s on the drawing should see it before you fall in love with it.

Who this is for

If you’re planning a custom house in Guyana and you haven’t hired anyone yet, apply for a Build-Readiness Review. We take your budget, your land and the house you have in mind, and cost it before anyone draws a line. If you go ahead and build with us, the fee comes off the build in full.

Not ready yet? Get the BackHome Building Guide. It’s the ten pages I’d want you to read before you hire a designer.

US$1,500. Application required, and we decline more projects than we take.

Sources

Construction rates reflect BackHome Developments pricing in 2026. Site works ranges are drawn from BackHome purchasing on East Bank projects. Soil test pricing is from a geotechnical engineering firm in Guyana, September 2026.

This is a planning guide, not a quotation. Every site and design prices differently.