Last verified: August 2026
A six-unit apartment block in Guyana, built to standard specification at around 900 square feet per unit, costs GYD 151 to 173 million to build. That is USD 756,000 to 864,000 at 200 to the dollar. Land, fill, fence, driveway and permits sit outside it, and so does the contingency you will need.
That number surprises people who have only ever priced a house. It should not. Six units at 900 square feet is 5,400 square feet of building, which is roughly twice the size of the four-bedroom family homes most of this site is about.
The one difference that changes everything
A house that runs out of money at 80 percent is a house you can move into and finish slowly. People do it every day in Guyana. It is uncomfortable and it costs more in the end, but you have somewhere to live.
A rental block that runs out of money at 80 percent earns nothing. Not less. Nothing. There is no tenant for a building with no kitchens in it. Your money is fully committed and your income is zero, and it stays zero until the last unit is finished.
This is why I am harder on rental clients than on families. The completion risk is the same risk. The consequence is worse.
What the build actually costs
Standard specification in Guyana runs GYD 28,000 to 32,000 per square foot, all trades included. That rate does not change because the building has six front doors instead of one. What changes is how much of it you are buying.
| Configuration | Floor area | At GYD 28,000 | At GYD 32,000 |
|---|---|---|---|
| 3 units, 900 sq ft | 2,700 sq ft | GYD 75.6M / USD 378,000 | GYD 86.4M / USD 432,000 |
| 4 units, 900 sq ft | 3,600 sq ft | GYD 100.8M / USD 504,000 | GYD 115.2M / USD 576,000 |
| 6 units, 900 sq ft | 5,400 sq ft | GYD 151.2M / USD 756,000 | GYD 172.8M / USD 864,000 |
Those figures are the building only. Add a minimum 10 percent contingency, which on the six-unit is GYD 15.1 million, and it stays untouched until something goes wrong. Something always goes wrong.
Then add what sits outside the walls. Water infrastructure and septic on a single house run GYD 1.7 million and GYD 1.5 million respectively. Treat those as your floor, not your figure. Six units put six times the load through one septic field, and sizing it for a house is how you end up digging it up in year three.
Where the money goes, and when
On a documented build we priced at Golden Grove, East Bank Demerara, everything up to and including the roof came to 29.1 percent of the total. Everything after the roof was 70.9 percent.
Read that again with a rental block in mind. When your building is roofed and standing and looks finished from the road, you have spent under a third of what it costs. On a six-unit at GYD 151 million, reaching roof stage costs about GYD 44 million and leaves GYD 107 million still to find.
Most stalled buildings in Guyana are stalled at exactly that point. Not because the owner was careless. Because the roof is where the visible progress ends and the expensive part begins.
What the units will actually rent for
Figures below come from listings advertised in 2026. Where a listing quotes Guyana dollars the US figure converts at 200.
| Location | Unfurnished, month | Furnished, month |
|---|---|---|
| Providence, gated, bills included | — | USD 1,500 to 2,500 |
| Providence, standard block | USD 600 to 900 | USD 1,000 to 1,500 |
| Herstelling, purpose-built | — | USD 1,400 to 1,600 |
| Eccles | USD 2,000 | USD 2,000 to 2,500 |
| Diamond | USD 700 to 900 | USD 1,200 to 1,250 |
| Ogle | — | USD 1,800 to 2,500 |
The furnishing gap decides more than the location does
There is a listing in Little Diamond advertising the same two-bedroom unit two ways. GYD 180,000 unfurnished. GYD 240,000 furnished. Same unit, same landlord, one line of copy between them.
That is a 33 percent difference on a furnishing spend you recover inside two years. Almost nobody models it before they build, and then they furnish nothing because the money ran out on the building.
The payback arithmetic nobody publishes
Take the six-unit at the bottom of the standard band. GYD 151.2 million for the building, plus minimum services, plus 10 percent contingency, lands near GYD 169.5 million. Call it USD 847,000, still excluding land, fill, fence and permits.
Rent all six furnished at the Herstelling rate of USD 1,400 and you gross USD 100,800 a year. Against USD 847,000 that reads as an eight and a half year payback, and that is the number people put in their spreadsheet.
It is the wrong number. Take off vacancy between tenants, maintenance, management if you are overseas, rates and taxes, and insurance. Thirty percent is a fair haircut and I have seen worse. Now you are netting about USD 70,600 a year and your payback is closer to twelve years.
Twelve years is a perfectly good investment. It is just not the eight and a half you were sold.
Build fewer units than the lot allows
This is where I disagree with most people who do this in Guyana, and you are free to disagree back.
The instinct is to maximise unit count, because more doors means more rent. What actually happens is that the budget gets spread thin across the units, the finishes drop to the cheapest thing that passes, and you end up competing at the bottom of the market where tenants leave for GYD 10,000 a month and your vacancy eats the difference.
Four well-finished units, furnished, in the Providence to Herstelling corridor will out-earn six cheap ones and cost you less to hold. The gap between USD 600 and USD 1,400 a unit is not location. It is specification.
What the lot is permitted to hold
Before any of the above matters, find out what you are legally allowed to put on the land. Plenty of scheme lots in Guyana cannot carry a six-unit block no matter what your budget says, and finding that out after you have paid for drawings is an expensive way to learn it.
Ground level against the crown of the road matters just as much. On the East Coast, fill has moved budgets by GYD 3 million before a block was laid. On a house that hurts. On a block sized to the last dollar it decides whether the project happens.
The Completion Doctrine™ applies harder here
A home should only be started when it is fully designed, fully costed, and financially structured to be finished. That is the whole principle, and on a rental block it stops being a philosophy and becomes arithmetic, because an unfinished block produces no income to rescue itself with.
Complete financial clarity means the full cost before design is locked, finishes and furnishing included, with 10 percent contingency held back. Design within reality means the unit count follows the budget. Fixed scope before construction means every selection priced up front, across every unit, because a change order repeated six times is six change orders. Structured execution means phased draws tied to completed work. Builder led from the start means someone who has priced the work is in the room before an architect draws a unit mix the budget cannot carry.
At BackHome Developments we do not just build homes. We build homes that actually get finished. That is the Completion Doctrine™.
Who this is not for
If your total build budget for a rental block is under USD 500,000 with land excluded, we are not your builder and I would rather say so here than on a call. Below that figure you are either building fewer units than makes the project worth doing, or you are dropping specification to a level that puts you in the wrong end of the rental market.
If you want to start before the design and the full costing are complete, we are also not a fit. On a rental block that approach does not produce a slow build. It produces a shell.
Find out what your budget actually finishes
The Build-Readiness Review answers one question with a real number attached. Can this budget finish this many units on this lot. You get the site measured, the cost model built against current supplier rates, the completion test run in both directions, and a recommendation you can act on.
Apply for a Build-Readiness Review
If you are earlier than that, the Guyana Rental Property Cost Guide has the rent tables by area with the furnished and unfurnished split laid out, and payback calculated on net rather than gross.
Related reading: what it costs to build a house in Guyana, site works cost before construction starts, and the Completion Doctrine in full.