How we build

Three phases, in order, on every house.

You know what the house costs before anyone draws it, and you see every stage before you pay for it. We don’t skip a phase to start sooner, because that is how houses stop at the roof.

US$1,500 / credited in full against your build
The three phases

From your budget to your keys.

Phase 01

Build-Readiness Review

We measure your lot, cost the house you have in mind against current supplier rates, and test it against the money you actually have, with a contingency. You get the answer in writing: proceed, revise first, or don’t build yet. US$1,500, credited in full against your build. About three weeks.

Phase 02

Design and fixed scope

The drawings are developed against the number, not the other way around. Engineering, finishes and every selection are priced from the drawings, line by line, and the permit goes to CH&PA. You get a fixed price built from real quantities before construction starts.

Phase 03

Construction and handover

A fixed-price contract. You pay for each stage after it is finished, and you see it in your client portal first: weekly site logs with photos, the live schedule, and a statement with every payment. It ends with a walkthrough, and every item on the list fixed before you take the keys.

Why the order matters

Houses rarely fail during construction. They fail during planning.

A house gets started on a number nobody checked. The design grows, the finishes are left as guesses, and the money runs out after the roof.

On one house we costed, about 29 percent of the money was spent by the time the roof went on. The kitchen, the bathrooms and the finishes come after, and that is where an unplanned budget runs out.

So every BackHome house is designed and costed to completion, and the money to finish it exists in writing, before a single block is laid. That is the Completion Doctrine.

Doing the work at the front costs weeks. Skipping it can cost the house.

Fit

What it takes from you.

UNDER US$500,000?

That’s the range we built Pristine Ridge Homes for. Four fixed-price homes from GYD 33M to 72M (about US$165,000 to 360,000), drawings and permits included, built on your land. See which one fits →

From abroad

You don’t need to be in Guyana to follow it.

Phase three lives in your client portal, and you can open it from Toronto, New York or London.

Next step

Start with a Build-Readiness Review.

One question, answered with a real number: can this budget finish this house on this site? US$1,500, credited in full against your build.